Platform upgraded. Please re-register to continue accessing our community! Sign Up Now >

Lift Bin (Including DFM)

Overview of the action process of the lifting silo: 1. Products in the material frame are manually placed into the material frame from outside the line, and the entire assembly is pushed into the equipment guide bearing by a customized lifting trolley module, with the material plate side clamp positioning the material frame position; 2. The products are transferred upward through the upgraded motor and lifting screw rod; 3. The first piece of product is positioned and clamped by the side clamp.
Patron
Sign in to download

This is a Patron item. Sign in to access it with free daily limits — or become a Patron for full access.

Sign In
or
Create free account
33.3K Views
28.1K Downloads

Published:

Jan 06, 2026 10:56 AM

Category:

Design Software:

Version:

File Formats:

Industry Application:

Sharing Level:

oarmstrong's items

Similar items

Backpack AGV
Patron
Backpack AGV

By hermina.spinka in 3D Model

13.6K Views
10.3K Downloads
3D Model of V12 Engine
Patron
3D Model of V12 Engine

By jordi73 in 3D Model

16.1K Views
12.8K Downloads
Automatic Motor Assembly Welding Machine
Patron
Automatic Attachment Equipment
Patron
Automatic Attachment Equipment

By joseph.purdy in 3D Model

10.7K Views
7.5K Downloads

We use cookies to personalize your experience. By continuing to visit this website you agree to our use of cookies

More