Platform upgraded. Please re-register to continue accessing our community! Sign Up Now >

Fully Automatic Electric Meter (NB Card Meter/IC Card Meter) Control And Upper Shell Assembly Line

The fully automatic control and upper shell assembly line includes - IC card meter upper cover component assembly module, NB card meter upper cover component assembly module, and rapid chain conveyor, etc. The above drawings are a 3D scheme diagram of a workstation inside the gas meter, which includes an AGV connected in-out turnover conveyor, servo turntable, servo handling robot, pneumatic handling robot, and other mechanisms. When creating schemes, everyone can learn from this.
Patron
Sign in to download

This is a Patron item. Sign in to access it with free daily limits — or become a Patron for full access.

Sign In
or
Create free account
26.8K Views
19.5K Downloads

herman.prosacco's items

Similar items

We use cookies to personalize your experience. By continuing to visit this website you agree to our use of cookies

More