M054-Five-time On-Off and Instantaneous Testing (Manufactured with BOM) Serial Line Feeding Method, with material flowing from the upstream equipment. The cylinder blocks, lifts, clamps, and positions the product. The test is conducted by the cylinder pushing the handle to perform On-Off testing five times to check whether the handle and internal structure are stable, followed by powering the product to test its performance.
Premium download
Subscribe to access all premium projects, a good reference data source for your engineering design.