The equipment operation process involves terminal cylinder feeding on the disc, bending, cutting, and moving the plastic body feeding method to the assembly position for PIN insertion. The second station involves tape cutting, secondary shifting by the cylinder, PIN insertion cutting, and finally, the last station is for continuity testing and good products discharge.
Patron
Sign in to download
This is a Patron item. Sign in to access it with free daily limits — or become a Patron for full access.