Platform upgraded. Please re-register to continue accessing our community! Sign Up Now >

Polishing Machine Loading And Unloading Equipment

Polishing Machine Loading And Unloading Equipment
Premium
Introduction to Action Process: 1. The AGV places the material frame filled with raw materials and the empty material frame respectively at the raw material feeding frame position and the cooked material unloading frame position, and the positioning cylinder positions the material frame; 2. The pick-and-place three-axis extracts individual pieces of raw material from the material frame and places them on the secondary positioning. After picking 12 pcs, secondary positioning occurs. Then, the pick-and-place three-axis places the secondarily positioned products, taking 3 pcs at a time, into the polishing machine fixture. This process is done four times to place a total of 12 pcs, and then the polishing machine starts working; 3. While the polishing machine is working, the three-axis extracts 12 pcs of raw materials from the material frame and places them in secondary positioning; 4. After the polishing machine finishes working, the three-axis extracts 3 pcs of finished materials from the polishing machine and places them in the secondary positioning temporary storage. Then, it picks 3 pcs of raw materials from secondary positioning to place them into the polishing machine fixture. This cycle is repeated four times. The polishing machine works, and simultaneously, the three-axis transfers finished materials from secondary positioning to the material frame. Once completed, the three-axis transfers raw materials from the material frame to secondary positioning, repeating this cycle. 5. When the three-axis does not pick and place raw and finished materials, the material frame will be soaked in the water tank; 6. After the raw material frame is emptied and the finished material frame is full, the AGV cart will come to take away the full finished material frame, place the empty raw material frame in the finished material frame position, and then place the fully loaded raw material frame it carries into the raw material frame position.

Premium download

Subscribe to access all premium projects, a good reference data source for your engineering design.

Subscribe to download
31.6K Views
22.1K Downloads

Published:

Jan 06, 2026 10:56 AM

Version:

v1

Category:

Design Software:

Version:

File Formats:

Industry Application:

Sharing Level:

cremin.joany's items

Inclined Conveyor Belt
Premium
Inclined Conveyor Belt

By cremin.joany in 3D Model

25.6K Views
18.6K Downloads
Automatic labeling machine - 3
Premium
Automatic labeling machine - 3

By cremin.joany in 3D Model

67.4K Views
57.9K Downloads
Plate Chain Conveyor Line - 2
Premium
Plate Chain Conveyor Line - 2

By cremin.joany in 3D Model

28.8K Views
23.5K Downloads
Automatic Chip Mounter
Premium
Automatic Chip Mounter

By cremin.joany in 3D Model

16.8K Views
12.6K Downloads

Similar items

We use cookies to personalize your experience. By continuing to visit this website you agree to our use of cookies

More