The wire threading equipment line supplies materials, and the products are stopped by the blocking cylinder as they flow into the equipment. The products are positioned for relative location using a lift-up and side-clamp method. The pneumatic cylinder module, equipped with copper pillars, performs electrical insulation resistance testing on the products. After the test is completed, the products flow to the next station for continuity testing.
Premium download
Subscribe to access all premium projects, a good reference data source for your engineering design.