The equipment has a six-station turntable, which are: 1. Main body feeding and installation station; 2. Feeding station/O-ring assembly station, where an operator manually places the O-ring on an external fixture, and the equipment automatically picks and installs the O-ring; 3. Inspection station; 4. Base automatic feeding and installation station; 5. Lifting and pressing station; 6. Testing and unloading station;
Premium download
Subscribe to access all premium projects, a good reference data source for your engineering design.