Progressive Die for Connecting and Installing Lugs on Air Conditioner Shells

0
Published by
Gideon Knight
66,431 views
|
50,222 downloads


The process of connecting the air conditioner shell with the installation earring progressive die is as follows: punching —– punch the middle connection —– notching —– punch the large hole —– make three projections — bending —— divided into two blanking. The concave and convex molds are split into two pieces for easy installation, with all lower mold workpiece areas using scrap parts. The parameters and parts of the mechanism are non-editable and have been verified and reasonably designed. The drawings are in a general-purpose STP format and can be opened with conventional 3D software.

Specification: Progressive Die for Connecting and Installing Lugs on Air Conditioner Shells

Design Software

Editable

,

File Formats

Industry Application

,

Sharing Level

Version

User Reviews

0.0 out of 5
0
0
0
0
0
Write a review

There are no reviews yet.

Be the first to review “Progressive Die for Connecting and Installing Lugs on Air Conditioner Shells”

Progressive Die for Connecting and Installing Lugs on Air Conditioner Shells
Progressive Die for Connecting and Installing Lugs on Air Conditioner Shells
3DMecWorks | Free Mechanical 3D Models & 2D Drawings
Logo
Please Login/Register to Download and View 3D Preview!
Shopping cart