Join 15,170,000 engineers with over 6,470,000 free CAD files. New user? Join the community or log in.

Progressive Die for Connecting and Installing Lugs on Air Conditioner Shells

0
Sold by
MrBlue
@ MrBlue
[mecworks-btn]

The process of connecting the air conditioner shell with the installation earring progressive die is as follows: punching —– punch the middle connection —– notching —– punch the large hole —– make three projections — bending —— divided into two blanking. The concave and convex molds are split into two pieces for easy installation, with all lower mold workpiece areas using scrap parts. The parameters and parts of the mechanism are non-editable and have been verified and reasonably designed. The drawings are in a general-purpose STP format and can be opened with conventional 3D software.

Specification: Progressive Die for Connecting and Installing Lugs on Air Conditioner Shells

Design Software

Editable

,

File Formats

Industry Application

,

Sharing Level

Version

User Reviews

0.0 out of 5
0
0
0
0
0
Write a review

There are no reviews yet.

Be the first to review “Progressive Die for Connecting and Installing Lugs on Air Conditioner Shells”

Your email address will not be published. Required fields are marked *

Progressive Die for Connecting and Installing Lugs on Air Conditioner Shells
Progressive Die for Connecting and Installing Lugs on Air Conditioner Shells
3DMecWorks | Free Mechanical 3D Models & 2D Drawings
Logo
Shopping cart