1. This workstation uses 2 robots respectively for loading and unloading, with a simple structure. Suitable for various specifications of door panels.
2. This production line is staffed with a total of 1 person, specifically as follows:
Auxiliary personnel (fork material – start machine) 1 person;
3. Product specifications: DW700-1400; DH2000-2400;
4. Production cycle of this line:
(1) 25 seconds/piece
Specification: Powder Coating Line for Elevator Door Panels Loading and Unloading Workstation
|
User Reviews
Be the first to review “Powder Coating Line for Elevator Door Panels Loading and Unloading Workstation”
You must be logged in to post a review.

There are no reviews yet.