Top Line Menu - SAVE20 Coupon
Limited Time Offer: Save 20% with coupon code SAVE20 - Valid on all Memberships

Outer Fan Blade Metal Shaft Assembly Project

0
Published by
Amani Howell
31,051 views
|
26,300 downloads


The loading manipulator places the product on the servo transfer platform. The transfer platform moves to the sprue punching position. After the sprue punching is completed, it moves to the buffer pad installation position. The buffer pads are installed in two steps: the front two first, then the rear two. After installation is completed, it moves to the grease application position. After application, the transfer platform runs to the retrieval position, waiting for the manipulator to retrieve. The manipulator retrieves the sprue and products and places the next set of products to be processed. The left and right workstations switch for production.

Specification: Outer Fan Blade Metal Shaft Assembly Project

Design Software

Editable

,

File Formats

Industry Application

Sharing Level

Version

User Reviews

0.0 out of 5
0
0
0
0
0
Write a review

There are no reviews yet.

Be the first to review “Outer Fan Blade Metal Shaft Assembly Project”

Outer Fan Blade Metal Shaft Assembly Project
Outer Fan Blade Metal Shaft Assembly Project
3DMecWorks | Free Mechanical 3D Models & 2D Drawings
Logo
Please Login/Register to Download and View 3D Preview!
Shopping cart