Overview of the action process of the lifting silo:_x000D_
1. Products in the material frame are manually placed into the material frame from outside the line, and the entire assembly is pushed into the equipment guide bearing by a customized lifting trolley module, with the material plate side clamp positioning the material frame position;_x000D_
2. The products are transferred upward through the upgraded motor and lifting screw rod;_x000D_
3. The first piece of product is positioned and clamped by the side clamp.
There are no reviews yet.