This set of equipment is an integrated automation equipment that processes door panels from the powder coating line through automatic double-sided tape adhesion, automatic decorative panel adhesion, automatic drilling (front), automatic riveting (front), automatic flipping, automatic drilling (back), and automatic riveting (back). Designed production line cycle time: 25±10% seconds/piece
Specification: Elevator Door Panel Automatic Assembly Line
|
There are no reviews yet.