M054-Five-time On-Off and Instantaneous Testing (Manufactured with BOM) Serial Line Feeding Method, with material flowing from the upstream equipment. The cylinder blocks, lifts, clamps, and positions the product. The test is conducted by the cylinder pushing the handle to perform On-Off testing five times to check whether the handle and internal structure are stable, followed by powering the product to test its performance.
Specification: Automation Five-Time On/Off And Instant Detection Equipment (Production Completed, Includes BOM) - SolidWorks - Free Download
|
User Reviews
Be the first to review “Automation Five-Time On/Off And Instant Detection Equipment (Production Completed, Includes BOM) - SolidWorks - Free Download”

There are no reviews yet.