The wire threading equipment line supplies materials, and the products are stopped by the blocking cylinder as they flow into the equipment. The products are positioned for relative location using a lift-up and side-clamp method. The pneumatic cylinder module, equipped with copper pillars, performs electrical insulation resistance testing on the products. After the test is completed, the products flow to the next station for continuity testing.
Specification: Automatic Power-On Withstanding Voltage Tester (BOM Included) - SolidWorks - Free Download
|
User Reviews
Be the first to review “Automatic Power-On Withstanding Voltage Tester (BOM Included) - SolidWorks - Free Download”

There are no reviews yet.