Automatic Lifting Silo Module (including Ppt)

0
Published by
Aiyana Collier
49,057 views
|
34,389 downloads


Introduction to the Operation of the Lifting Bin Module Equipment:
1. Place the first empty pallet into the lifting bin.
2. The bin rises to the highest position, ensuring the insertion height for the operator is around 900mm.
3. After the bin is full, place the second empty pallet.
4. Use the dual-hand buttons to activate the lifting function. The bin will descend by the height of one pallet, ensuring the insertion height for the operator remains around 900mm, and so on.
5. Once full, insert the quick-release handle to push the cart into the loading bin, then remove the quick-release handle.

Specification: Automatic Lifting Silo Module (including Ppt)

Design Software

Editable

,

File Formats

, ,

Industry Application

Sharing Level

Version

User Reviews

0.0 out of 5
0
0
0
0
0
Write a review

There are no reviews yet.

Be the first to review “Automatic Lifting Silo Module (including Ppt)”

Automatic Lifting Silo Module (including Ppt)
Automatic Lifting Silo Module (including Ppt)
3DMecWorks | Free Mechanical 3D Models & 2D Drawings
Logo
Please Login/Register to Download and View 3D Preview!
Shopping cart