Automatic Feeding Production Line for Elevator Door Panel Reinforcement Ribs

0
Published by
Anya Weiss
38,600 views
|
27,985 downloads


Notes:
1. The main purpose of this production line is to address the layout problem of the stiffeners during the welding process of elevator door panels; it adopts a material layout solution for processing the door panels during circulation/stiffeners during bending simultaneously.
2. The production line is staffed with a total of 1 person, as follows:
1) Stiffener bending/material layout: 1 person;
3. Product specifications: all elevator door panels;
4. Production line cycle time:
(1) 28 seconds/item (standard door panel with single stiffener)

Specification: Automatic Feeding Production Line for Elevator Door Panel Reinforcement Ribs

Design Software

Editable

,

File Formats

,

Industry Application

Sharing Level

Version

User Reviews

0.0 out of 5
0
0
0
0
0
Write a review

There are no reviews yet.

Be the first to review “Automatic Feeding Production Line for Elevator Door Panel Reinforcement Ribs”

Automatic Feeding Production Line for Elevator Door Panel Reinforcement Ribs
Automatic Feeding Production Line for Elevator Door Panel Reinforcement Ribs
3DMecWorks | Free Mechanical 3D Models & 2D Drawings
Logo
Please Login/Register to Download and View 3D Preview!
Shopping cart