This drawing is for the assembly of a nitrogen gas spring component. It primarily involves the assembly of sub-parts, considering cycle times and increasing production efficiency. Two identical production lines are symmetrically arranged to facilitate future modifications. For small parts, priority is given to using fast mechanical arms like PPU for loading. Since the product involves cylindrical parts, 180° clamping jaws are used, avoiding interference with the product and reducing movement frequency. Version SW2018, includes parameters, editable.
There are no reviews yet.